Evolution Technologies MK-461C Manual do Utilizador Página 7

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 6
EMC seminar
Pre-compliance vs. Full compliance measurements
Page 7
Pre-compliance measurements
Evaluate the conducted and radiated emissions
of a device using correct detectors and
bandwidths before going to a test house for
compliance testing
Full Compliance measurements
Full compliance testing requires a receiver that
meets the requirements of CISPR part 16-1-1 (for
commercial) or MIL-STD-461 (for military), a
qualified open area test site or semi anechoic
chamber and an antenna tower and turntable to
maximize EUT signals.
Vista de página 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 104 105

Comentários a estes Manuais

Sem comentários